翻訳と辞書
Words near each other
・ Grand Maket Rossiya
・ Grand Mal (band)
・ Grand Mal (New York City band)
・ Grand Manan Airport
・ Grand Manan Community School
・ Grand Manan Island
・ Grand Manan Parish, New Brunswick
・ Grand manner
・ Grand Marais
・ Grand Marais Air Force Station
・ Grand Marais Airport
・ Grand Marais Creek
・ Grand Marais Harbor of Refuge Inner and Outer Lights
・ Grand Marais Light
・ Grand Marais Road (Windsor, Ontario)
Grand Marais Trail
・ Grand Marais, Manitoba
・ Grand Marais, Michigan
・ Grand Marais, Minnesota
・ Grand Marais, Seeland
・ Grand Marais/Cook County Airport
・ Grand Marais/Cook County Seaplane Base
・ Grand Marnier
・ Grand Marquis (album)
・ Grand Marsh, Wisconsin
・ Grand marshal
・ Grand Marshal (RPI)
・ Grand Marshal of Ayacucho Symphony Orchestra
・ Grand marshal of the palace
・ Grand Marshals of the Tournament of Roses Parade


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Grand Marais Trail : ウィキペディア英語版
Grand Marais Trail

The Grand Marais Trail is the name of a small bicycle trail that follows Turkey Creek (also known as the Grand Marais Drain) in the middle of Windsor, Ontario. It starts off as a minor spur route, connecting the West Windsor Recreationway with Huron Church Road and the neighbourhood of South Windsor (via a tunnel under Huron Church Road, and light at Grand Marais Rd. if the tunnel is closed).
== Routing and path description ==
The trail begins as a link to the West Windsor Recreationway, and travels along Grand Marais Road, with a spur branch heading south and under Huron Church Road. The trail continues along its own alignment before leading to bike lanes at West Grand Boulevard. The original path only travelled as far as Balmoral Avenue and California Avenue (both residential streets) until very recently, having been constructed as either a gravel or concrete-paved trail.
Bike lanes continue along both sides of Turkey Creek (Grand Marais Road West, and West Grand Boulevard), with a trail bypass heading along Academy Drive and Radisson Court West, before becoming its own trail between houses and Turkey Creek. The trail's three branches all meet up at Bruce Avenue (which is the main thoroughfare for vehicular traffic as well as cycling traffic heading to and from Grand Marais Road), where the routing continues along West Grand Boulevard. In between the three alignments, a bridge connects the Grand Marais Road bike lanes to the "bypass" (along Academy Drive) and to West Grand Blvd.'s bike lanes at Virginia Park Avenue.
The trail continues as a separated path again from intersection of West Grand Boulevard and South Cameron Boulevard on the north side of the road to intersection with Howard Avenue. As it crosses two tracks of the CASO Subdivision CN Rail line at-grade, it continues due north along the west side of Howard Avenue, serving Devonshire Mall and Roundhouse Centre. The path then crosses the Roundhouse Centre/Devonshire Mall plaza entrances and switches to the east side of Howard Avenue, heading due north.
The path then crosses the northbound-to-eastbound onramp to E.C. Row Expressway, which currently presents a dangerous situation (high-speed cars and transport trucks driving by without a safe crossing light for pedestrians or cyclists). After this onramp, the path travels underneath E.C. Row Expressway, meeting the already-open stretch of trail just north of the traffic lights serving the westbound offramp.
Between Grand Marais Road East and the E.C. Row ramp intersection, the trail heads northeast, with a spur joining it from the intersection of Grand Marais Road. The trail leads north-east, while a second branch continues due north before terminating at Remington Avenue.
The main trail heads between Turkey Creek and a few industrial offices. All trail sections and branches are a minimum of four lanes wide (enough width for four bikes to ride side-by-side).
The road crosses Elsmere Avenue and Langois Avenue before having a spur branch off to link the trail to Brookview Crescent (and a small playground at the corner of Brookview Cres. as it curves).
Langois Avenue and Parent then lead towards the Remington Booster Park and its trail system, and eventually, towards bike lanes on Parent Avenue, with the final end at Riverside Drive and the Riverfront Bike Trail.
The next spur heads due south to meet Conservation Drive (which indirectly links the trail to the Devonwood Trail).
As the trail passes the Fogolar Furlan club, it splits into two alignments: one curves to the south to meet Parkdale Place, while the main route heads north to meet Turner Road. A "temporary crossing for pedestrians and cyclists" (as said by the City of Windsor) exists between Grand Marais Road and Memorial Drive, at the intersections of the discontinuous segments of Turner Road, to allow pedestrians to access shops while Walker Road is re-built below the CP Rail line. The current trail (temporary or not) meets the single CP line at-grade, with crossing signals. At Memorial Drive, the trail then meets Walker Road at the Grand Marais intersection, and heads west towards Memorial Park, meeting the trail network in that park.
East of Walker Road, the trail continues in several discontinuous segments, though these are expected to be linked together as one long trail serving the Chrysler Minivan Plant. The trail resumes at the south side of the intersection of Chrysler Centre Drive (formerly the southern extension of Drouillard Road) and Grand Marais Road East, continuing until Meldrum Road.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Grand Marais Trail」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.